2023
Public Access to Information –Sect. 6 (6) (Contracts valued at $50,000 or more)
Bermuda Housing Corporation
Notice 2023
This Notice applies to the contracts contained in the following Table:
Name of Contractor/ Contracting Parties | Contract Start Date | Contract End Date | Description of Goods/ Services Provided | Contract Value |
Troy Govia
|
01/20/2023 | 06/08/2023 | #5 Aunt Jinny’s Lane, Renovation, and conversion of 3-bedroom 1 bathroom house into 4-Bedroom 2-bathroom house | $132,000.00 |
Rise & Shine Construction
|
12/06/2022 | 04/14/2023 | # 109 South Road, Harmony Terraces West, Block B. (8) studio apartments, demolition and removal of interior ceilings, walls, windows, doors, plumbing and electrical. Prepare and install new interior walls, plumbing, electrical, floors and flooring, tiles, ceilings, walls, partial install of new roof and frame, kitchen, and windows as per plan. Prepare and Paint walls, ceilings, frames, and doors. | $780,000.00 |
LD Construction
|
01/23/2023 | 07/01/2023 | #3 Rock Oven Lane, Renovation with new layout of 3 Bedroom cottage, Major Roof replacement and repairs, add new bathroom | $258,500.00 |
Bermuda Drywall & Ceilings Ltd.
|
12/22/2022 | 8/31/2023 | Seven Arches (BHC Bldg), 1st Floor, 44 Church Street ,supply and install, drywall partitions and ceiling grids to reconfigure the layout of the floor to increase the number of workstations and occupancy of the floor by Departments of IDT and EDD respectively. | $88,050.00 |
Vision Painting & Maintenance services
|
02/22/2023 | 05/01/2023 | #27 Beacon Hill Road, Phase 2 construction of interior renovations and alterations to existing 2 dwelling unit to create a single 5-bedroom, 5-bathroom unit. | $112,490.00 |
Zeus Interiors
|
03/20/2023 | 04/15/2023 | #27 Beacon Hill Road, Phase 2 installation of stud partition walls and erecting of ceilings. | $51,210.00 |
General Services, Ltd.
|
05/02/2023 | 07/22/2023 | #1 Grandstand Lane, Unit 2, East. Removal of vinyl veneer and refinish with plaster. Replace windows and doors. Install new bathroom fittings and fixtures and new flooring and repair electrical throughout the unit. Painting of ceiling and walls. | $68,000.00 |
Vision Painting & Maintenance services
|
06/19/2023 | 07/31/2023 | #27 Beacon Hill Road, Phase 3, exterior renovations including removal, repairs, and installation of eyebrows, moldings, stairs, steppingstones, painting, plastering of walls, demolition of shed and construction of a new parking area. | $82,000.00 |
LD Construction
|
08/23/2023 | 02/15/2024 | #79 Southside Road, interior renovations to units 127, 129, 227, 229, 327 and 329. Creation of additional bathrooms within units and associated plumbing, electrical, masonry, tiling and flooring to allow for flexible configuration. | $189,500.00 |
Telford Electric
|
10/01/2023 | 03/30/2024 | Seven Arches, (BHC Bldg), #44 Church Street, 3rd Floor Electrical installation and supply of materials, completing the fit out for the Department of Planning. | $182,530.01 |
Global Innovations
|
09/25/2023 | 02/20/2024 | #2 Wellington Road, renovation, and reconfiguration of cottage to create a 3-bedroom, 1-bathroom cottage, and to replace compromised floors and roof. | $167,964.70 |
Rise & Shine Construction
|
06/13/2023 | 11/01/2023 | # 109 South Road, Harmony Terraces East, Block D & E, Interior demolition, and removal of existing cast iron pipes, electrical, rot, termites, and timber. Secure all load bearing walls. | $140,000.00 |
Bermuda Drywall & Ceilings Ltd | 11/01/2022 | 03/01/2023 | Seven Arches (BHC Bldg), #44 Church Street, 1st Floor Supply and Install Glass system for Box-in offices and to maximize the number of occupants on the floor for the departments of IDT and EDD. | $86,950.00 |
BAC Group of Companies | 11/15/2023 | 02/16/2024 | #26 Tommy Fox Road, Installation of hot and cold-water mains, hot water circulating system, pump, control valves and return lines | $143,599.00 |
Aircare Limited
|
06/23/2023 | 11/30/2023 | Seven Arches (BHC Bldg), #44 Church Street, 1st Floor Install new duct work and new HVAC systems including discounting and removal of old system and to maximize the number of occupants on the floor creating an environment that that ensures maximum efficiency thereby anticipating savings across the operations of the building and the EDD and IDT departments. | $278,006.00 |
Aircare Limited
|
09/21/2023 | 04/01/2024 | Seven Arches (BHC Bldg), #44 Church Street, 3rd Floor Disconnect and remove existing ductwork system and Install a New Ductwork environmental system, and to maximize the number of occupants on the floor creating an environment that that ensures maximum efficiency thereby anticipating savings across the operations of the building and the Dept of Planning team. | $329,624.00 |
Stanley Construction Limited
|
02/26/2023 | 06/20/2023 |
#1 Redcoat Lane, Interior renovation to convert a three-bedroom one bath house to a four-bedroom two bath house via creation of an attic floor and dormers.
|
$233,696.70 |
Telford Electric | 03/01/2023 | 12/31/2023 | Seven Arches (BHC Bldg), #44 Church Street, 1st Floor, electrical installation and supply of materials completing the fit out for the Departments of EDD and IDT. | $96,418.60 |
Information Officer
Bermuda Housing Corporation
December 31st, 2023